List of Technical Studies

You can also filter technical studies from publication database.
Jakus, Damir and Vasilj, Josip and Bego, Ozren : Selection of optimal capacity and analysis of profitability of investment in battery storage within the WPP Vrataruša, 2022.

Abstract: The study considers the construction of a battery system within the existing wind farm connected to the transmission grid, which will enable the provision of a balancing service to HOPS in the form of offering aFRR power reserve in the amount of a minimum of 1 MW with the activation of balancing energy at their request. Through the developed optimization model, it is necessary to find the optimal combination of electricity sales on the day-ahead market and the regulated balancing energy market. Also, with regard to the estimated overall costs of the battery system and the optimal combined performance on the balancing energy market and the day-ahead market, it is necessary to find the optimal size of the battery that needs to be installed with the mentioned wind farm, which will ensure the fastest return on investment.

Barbir, Frano and Jakus, Damir and Vasilj, Josip and Pivac, Ivan : Pre-feasibility study of the construction of an electrolyser within the area of ​​the Rijeka Oil Refinery, 2021.

Abstract: As part of the study, different variants of electrolyzer plant construction with standard fixed typical nominal powers and electrolyzer plant powers that were optimized using a developed optimization model were considered, which simultaneously takes into account the increase in investment costs and the increase in income from the provision of mFRR auxiliary services, i.e. the reduction of operating costs in the part of electricity procurement of energy in the event of an increase in the rated power of the plant. Based on the results of the optimization model, an analysis of the profitability of the investment in the electrolysis plant was performed, and the levelized cost of green hydrogen production was calculated, taking into account the detailed investment and operating costs.

Jakus, Damir and Vasilj, Josip and Goić, Ranko and Penović, Ivan : Development of the distribution network of Elektrodalmacija Split, field units in Sinj, Imotski, Vrgorac, Makarska, Ploče, Metković, Brač, Hvar, and Vis, as well as the island of Šolta, for the next 20 years, 2021.

Abstract: In this study, a proposal for the development of the distribution network is provided based on the current state and projected growth of consumption in the considered area. The development plan is based on a detailed model of the HV (High Voltage) power grid and includes detailed development guidelines for five-year periods. A forecast for the increase in consumption based on historical trends and plans for the implementation of new major consumer facilities has been prepared for the distribution network. As part of the distribution network development plans, approximate costs for the implementation of various development options are provided. An analysis of the dynamics of transitioning certain distribution units (distribution substations and offices) to a 20 kV operating voltage has been conducted using the Analytic Hierarchy Process.

Goić, Ranko and Vasilj, Josip and Jakus, Damir and … : Development of software tool for calculation of hydropower production, 2015.

Abstract: As part of this study, a software package was developed and an appropriate procedure for evaluating the energy potential of hydropower projects was defined, which determines the basic energy-technical characteristics of an individual project. An appropriate budget and calculation model was elaborated in order to analyze the potential of hydropower projects. The purpose is to develop a method for calculating the installed power and possible electricity production of hydroelectric power plants at a particular location, which can thus serve as a support in investment decision-making for hydroelectric power plant construction projects, regardless of whether it was a preliminary analysis of the potential of a potential location or a check of an already designed project solution .

Goić, Ranko and Penović Ivan, Krstulović Jakov and Vasilj Josip and Jakus, Damir : Planning and development of the medium voltage distribution grid in the area Elektrodalmacija Split for the following 20 years, 2015.

Abstract: In this study, a proposal for the development of the distribution network is given based on the current situation and the forecasted growth of consumption in the considered area. The development plan is based on a detailed model of the MV power network and contains detailed development guidelines for five-year periods. For the distribution network, a forecast of the increase in consumption was made based on historical trends and plans for the realization of new larger consumer facilities. As part of the development plans for the distribution network, the approximate costs of the realization of certain variants of development are also given. Based on the analytical-hierarchical method, an analysis of the dynamics of the transition to 20 kV operating voltage of certain distribution units (distribution plants and offices) was performed.

Goić, Ranko and … and Jakus, Damir and … : Preliminary grid connection analysis and solution for WPP Tovarnik, 2014.

Abstract: The study examines and selects the method of connecting the Tovarnik wind power plant to the 110 kV transmission network or the 30 kV distribution network, and examines the power flows in characteristic stationary modes of operation, in variants of complete availability of the transmission network and variants N-1

Goić, Ranko and Penović Ivan, Krstulović Jakov and Vasilj Josip and Jakus, Damir : Development of distribution grid for next 20 years for the distribution area Elektra Zadar, 2014.

Abstract: In this study, a proposal for the development of the distribution network is given based on the current situation and the forecasted growth of consumption in the considered area. The development plan is based on a detailed model of the MV power network and contains detailed development guidelines for five-year periods. For the distribution network, a forecast of the increase in consumption was made based on historical trends and plans for the realization of new larger consumer facilities. As part of the development plans for the distribution network, the approximate costs of the realization of certain variants of development are also given. Based on the analytical-hierarchical method, an analysis of the dynamics of the transition to 20 kV operating voltage of certain distribution units (distribution plants and offices) was performed.

Goić, Ranko and Tojčić, Ante and Jakus, Damir and … : Energy and economic analysis of the sHPP Peruća - novelation, 2014.

Abstract: As part of this study, the energy-economic analysis of the construction of the Peruca HPP was updated, where as part of it: a) The change in the operation regime of the Peruca HPP and the way of using the Peruca reservoir is analyzed with regard to work with new aggregates. b) The expected annual production of MHE Peruca is calculated with the revised engagement regime in such a way that the water from the reservoirs is used in the most efficient way. c) The costs of investment and operation of MHP Peruca are updated, taking into account the available documentation of the main project, the expected obligations of MHP Peruca based on valid regulations and the current conditions of procurement of equipment and works. d) The economic value of the electricity produced at the Peruca HPP is determined with regard to the existing incentive system.

Goić, Ranko and Mudnić, Eugen and Jakus, Damir and Penović. Ivan and Krstulović, Jakov and Molk, Nataša and Jakovčević, Silvana : Technical-economical due diligence for WPP Lukovac, 2014.

Abstract: As part of the technical-environmental in-depth survey, in addition to the analysis of the previous ones, a new wind study and a long-term production assessment were made using the provided measurement data for configurations with five different types of wind turbines. Next, the technical aspects of possible variants of wind turbines were analyzed, as well as project solutions, studies, contracts, permits and other documentation submitted by the project owner, which were prepared and implemented in the development of the Lukovac HPP project so far. In accordance with the project task, an assessment of all future costs of the preparation, construction and operation of the wind power plant was made, as well as a recommendation for the assessment of future income as a technical basis for assessing the value of the project. Identification and assessment of key risks was also made, presented at the end in tabular form according to the structure defined by the Client.

Goić, Ranko and … and Jakus, Damir and … : Optimal technical solution for transmission grid connection of WPP ST3-1/2 Visoka Zelovo, 2013.

Abstract: As part of this study, the technical and energy requirements that the wind power plant must fulfill in order to obtain approval for connection to the grid are given. As part of the study, an analysis of the existing/planned state of the transmission/distribution network was performed, and proposals were made for connection to the network, as well as requirements related to the creation of conditions in the network necessary for the realization of the connection according to the proposed variant. The technical solution for connecting to the network is based on the application of standard solutions and equipment in accordance with the applicable legal and technical regulations. For the proposed connection solution that technically meets the conditions in the network, an estimate of the costs of connecting to the network and creating technical conditions in the network is given.

Goić, Ranko and Penović Ivan, Krstulović Jakov and Vasilj Josip and Jakus, Damir : Planning and development of the medium voltage distribution grid in the area Elektrojug for the period 2011-2031., 2013.

Abstract: In this study, a proposal for the development of the distribution network is given based on the current situation and the forecasted growth of consumption in the considered area. The development plan is based on a detailed model of the MV power network and contains detailed development guidelines for five-year periods. For the distribution network, a forecast of the increase in consumption was made based on historical trends and plans for the realization of new larger consumer facilities. As part of the development plans for the distribution network, the approximate costs of the realization of certain variants of development are also given. Based on the analytical-hierarchical method, an analysis of the dynamics of the transition to 20 kV operating voltage of certain distribution units (distribution plants and offices) was performed.

Goić, Ranko and … and Jakus, Damir and … : Preliminary grid connection analysis and solution for WPP ZD2P and WPP ZD3P, 2013.

Abstract: As part of this study, the technical and energy requirements that the wind power plant must fulfill in order to obtain approval for connection to the grid are given. As part of the study, an analysis of the existing/planned state of the transmission/distribution network was performed, and proposals were made for connection to the network, as well as requirements related to the creation of conditions in the network necessary for the realization of the connection according to the proposed variant. The technical solution for connecting to the network is based on the application of standard solutions and equipment in accordance with the applicable legal and technical regulations. For the proposed connection solution that technically meets the conditions in the network, an estimate of the costs of connecting to the network and creating technical conditions in the network is given.

Goić, Ranko and … and Jakus, Damir and … : Preliminary grid connection analysis and solution for WPP Čućin, 2013.

Abstract: The study examines and selects the method of connecting the Čućin wind power plant to the 110 kV transmission network or the 30 kV distribution network, and examines the power flows in characteristic stationary modes of operation, in variants of complete availability of the transmission network and variants N-1

Goić, Ranko and … and Jakus, Damir and … : Preliminary grid connection analysis and solution for WPP Otrić, 2013.

Abstract: The study examines and selects the method of connecting the Otrić wind power plant to the 110 kV transmission network or the 30 kV distribution network, and examines the power flows in characteristic stationary modes of operation, in variants of complete availability of the transmission network and variants N-1

Goić, Ranko and Paić, Goran and Jakus, Damir and Vasilj, Josip and Krstulović, Jakov and Vasilj, Josip : Interpolation of TS 220/110/35/20(10) kV Plat into existing power system grid, 2012.

Abstract: This study deals with the issue of entering into operation TS 220/110/35/20(10) kV Plat and the associated connection lines 220, 110, 35 and 20(10) kV, which connect the TS in question to the transmission and distribution network. TS Plat is a complex building where the process of transforming electricity into four voltage levels takes place. For this reason, it is necessary to plan the entry into operation of TS Plat in an optimal way, with as little unavailability as possible in the first line of the transmission network, the building in question assumed the position of the most significant power facility in the wider Dubrovnik area.

Goić, Ranko and … and Jakus, Damir and … : Preliminary grid connection analysis and solution for WPP Orljak, 2012.

Abstract: The study examines and selects the method of connecting the Orljak wind power plant to the 110 kV transmission network or the 30 kV distribution network, and examines the power flows in characteristic stationary modes of operation, in variants of complete availability of the transmission network and variants N-1

Goić, Ranko and … and Jakus, Damir and … : Preliminary grid connection analysis and solution for WPP Boraja II, 2012.

Abstract: The study deals with and selects the method of connecting the Boraja II wind power plant to the 110 kV transmission network or the 30 kV distribution network, and examines the power flows in characteristic stationary modes of operation, in variants of complete availability of the transmission network and variants N-1

Goić, Ranko and Penović, Ivan and Paić, Goran and Jakus, Damir and Lovric, Dino : Optimal technical solution for transmission grid connection of WPP ST1-1 Voštane and WPP ST1-2 Kamensko, 2012.

Abstract: As part of this study, the technical and energy requirements that the wind power plant must fulfill in order to obtain approval for connection to the grid are given. As part of the study, an analysis of the existing/planned state of the transmission/distribution network was performed, and proposals were made for connection to the network, as well as requirements related to the creation of conditions in the network necessary for the realization of the connection according to the proposed variant. The technical solution for connecting to the network is based on the application of standard solutions and equipment in accordance with the applicable legal and technical regulations. For the proposed connection solution that technically meets the conditions in the network, an estimate of the costs of connecting to the network and creating technical conditions in the network is given.

Goić, Ranko and … and Jakus, Damir and … : Optimal technical solution for transmission grid connection of WPP Lukovac, 2012.

Abstract: As part of this study, the technical and energy requirements that the wind power plant must fulfill in order to obtain approval for connection to the grid are given. As part of the study, an analysis of the existing/planned state of the transmission/distribution network was performed, and proposals were made for connection to the network, as well as requirements related to the creation of conditions in the network necessary for the realization of the connection according to the proposed variant. The technical solution for connecting to the network is based on the application of standard solutions and equipment in accordance with the applicable legal and technical regulations. For the proposed connection solution that technically meets the conditions in the network, an estimate of the costs of connecting to the network and creating technical conditions in the network is given.

Goić, Ranko and Penović, Ivan and Paić, Goran and Jakus, Damir and Lovric, Dino : Preliminary grid connection analysis and solution for WPP ST3-1/2 Visoka Zelovo, 2012.

Abstract: The study deals with and selects the method of connecting the wind power plant ST3-1/2 Visoka Zelovo to the 110 kV transmission network or the 30 kV distribution network, and examines power flows in characteristic stationary modes of operation, in variants of complete availability of the transmission network and variants N-1

Goić, Ranko and Penović, Ivan and Paić, Goran and Jakus, Damir and Lovric, Dino : Optimal technical solution for transmission grid connection of WPP Ogorje, 2012.

Abstract: As part of this study, the technical and energy requirements that the wind power plant must fulfill in order to obtain approval for connection to the grid are given. As part of the study, an analysis of the existing/planned state of the transmission/distribution network was performed, and proposals were made for connection to the network, as well as requirements related to the creation of conditions in the network necessary for the realization of the connection according to the proposed variant. The technical solution for connecting to the network is based on the application of standard solutions and equipment in accordance with the applicable legal and technical regulations. For the proposed connection solution that technically meets the conditions in the network, an estimate of the costs of connecting to the network and creating technical conditions in the network is given.

Goić, Ranko and … and Jakus, Damir and … : Preliminary grid connection analysis and solution for WPP Crno brdo, 2011.

Abstract: The study deals with and selects the method of connecting the Crno Brdo wind farm to the 110 kV transmission network or the 30 kV distribution network, and examines the power flows in characteristic stationary modes of operation, in variants of complete availability of the transmission network and variants N-1

Goić, Ranko and Vasilj, Josip and Penović, Ivan and Paić, Goran and Jakus, Damir : Concept design and variants for construction of transformer station 110/x kV Zamošće, 2011.

Abstract: The purpose of this report is to review the basic variants of the construction and connection of the new TS 110/x Zamošće. The construction of TS 110/x kV Zamošće was initiated by a request for the connection of a new customer (Bili dvori Tourist Village, 2.2 MW). The additional burden of the transformation in TS 35/10 kV Zamošće leads to the limit load of the same and endangering the already bad voltage conditions.

Goić, Ranko and Vasilj, Josip and Penović, Ivan and Jakus, Damir and Paić, Goran : Analysis of the possibility of series reactor interpolation in OHL 110 kV Meterize-Vrboran, 2011.

Abstract: As part of this study, the following was given: - basic analysis of the application of a series choke on DV 110 kV Meterize-Vrboran in order to equalize the power flows of the mentioned transmission line and eliminate its overloading. - Analysis of power flows in characteristic situations in the network and selection of the basic technical parameters of the series ballast. - Review of alternative solutions. - Analysis of transient phenomena during connection/disconnection of DV 110 kV on which the ballast will be installed.

Goić, Ranko and Penović, Ivan and Krstulović, Jakov and Vasilj, Josip and Jakus, Damir : Planning and development of the medium voltage distribution grid in the area Elektra Šibenik for the following 20 years, 2010.

Abstract: In this study, a proposal for the development of the distribution network is given based on the current situation and the forecasted growth of consumption in the considered area. The development plan is based on a detailed model of the MV power network and contains detailed development guidelines for five-year periods. For the distribution network, a forecast of the increase in consumption was made based on historical trends and plans for the realization of new larger consumer facilities. As part of the development plans for the distribution network, the approximate costs of the realization of certain variants of development are also given. Based on the analytical-hierarchical method, an analysis of the dynamics of the transition to 20 kV operating voltage of certain distribution units (distribution plants and offices) was performed.

Goić, Ranko and … and Jakus, Damir and … : Preliminary grid connection analysis and solution for WPP Čemernica, 2010.

Abstract: The study deals with and selects the method of connecting the Čemernica wind power plant to the 110 kV transmission network or the 30 kV distribution network, and examines the power flows in characteristic stationary modes of operation, in variants of complete availability of the transmission network and variants N-1

Goić, Ranko and Paić, Goran and Jakus, Damir and Penović, Ivan and Lovric, Dino : Optimal technical solution for transmission grid connection of WPP Glunča, 2010.

Abstract: As part of this study, the technical and energy requirements that the wind power plant must fulfill in order to obtain approval for connection to the grid are given. As part of the study, an analysis of the existing/planned state of the transmission/distribution network was performed, and proposals were made for connection to the network, as well as requirements related to the creation of conditions in the network necessary for the realization of the connection according to the proposed variant. The technical solution for connecting to the network is based on the application of standard solutions and equipment in accordance with the applicable legal and technical regulations. For the proposed connection solution that technically meets the conditions in the network, an estimate of the costs of connecting to the network and creating technical conditions in the network is given.

Goić, Ranko and … and Jakus, Damir and … : Preliminary feasibility analysis for WPP Mikanovci with grid connection solution and techno-economic/spatial data, 2010.

Abstract: In the study, a preliminary analysis of the justification of the construction of the Mikanovci wind farm and the connection to the power grid was carried out with techno-economic data and spatial planning data in order to obtain a preliminary approval for the construction of the production facility.

Goić, Ranko and … and Jakus, Damir and … : Alternative grid connection solutions for wind power plant locations owned by EHN d.o.o. in Split-dalmatia couty, 2010.

Abstract: In the study, a preliminary analysis of the justification for the construction of a hydropower plant owned by the company EHN d.o.o. was carried out with a proposal for connection to the electric power network and defined techno-economic data and spatial planning data with the aim of obtaining prior approval for the construction of a production facility.

Goić, Ranko and Jakus, Damir and Lovric, Dino : Grid connection options and risks for WF Bradarica kosa and WF Kocinje brdo, 2010.

Abstract: Grid connection options and risks for WF Bradarica kosa and WF Kocinje brdo

Goić, Ranko and … and Jakus, Damir and … : Preliminary grid connection analysis and solution for WPP Ljubač, 2010.

Abstract: The study examines and selects the method of connecting the Ljubač wind power plant to the 110 kV transmission network or the 30 kV distribution network, and examines the power flows in characteristic stationary modes of operation, in variants of complete availability of the transmission network and variants N-1

Goić, Ranko and Paić, Goran and Jakus, Damir and Lovric, Dino : Optimal technical solution for transmission grid connection of WPP Jelinak, 2010.

Abstract: As part of this study, the technical and energy requirements that the wind power plant must fulfill in order to obtain approval for connection to the grid are given. As part of the study, an analysis of the existing/planned state of the transmission/distribution network was performed, and proposals were made for connection to the network, as well as requirements related to the creation of conditions in the network necessary for the realization of the connection according to the proposed variant. The technical solution for connecting to the network is based on the application of standard solutions and equipment in accordance with the applicable legal and technical regulations. For the proposed connection solution that technically meets the conditions in the network, an estimate of the costs of connecting to the network and creating technical conditions in the network is given.

Goić, Ranko and Jakus, Damir and Krstulović, Jakov : Study on ancillary services for power system, 2010.

Abstract: In this paper, a large number of issues are analyzed and concrete proposals are given related to the definition of technical conditions, the regulatory basis, the method of determining the costs and prices of auxiliary services, the technical capabilities of network users in terms of the possibility of delivering auxiliary services (including measurement and quality control), the possibility of forming markets for certain auxiliary services, and the contracting model for them. In addition, the necessary changes to the by-laws necessary for the implementation of the aforementioned proposals are proposed, whereby the primary consideration is the combined model of binding auxiliary services (which are not paid for) and auxiliary services that will be paid for at a regulated price, but clearly stated so that in the provision of auxiliary services can also include new producers.

Goić, Ranko and Jakus, Damir and Krstulović, Jakov : Short circuit analysis for the WPP Jelinak, 2010.

Abstract: The subject of this study is the calculation of the short circuit of the Jelinak wind power plant for the planned condition of the connection and the surrounding power grid. The short-circuit calculation was performed primarily for the purposes of dimensioning the primary equipment of the connecting TS 12/110 kV Jelinak and for the purposes of adjusting the relay protection system of the Jelinak wind power plant.

Goić, Ranko and … and Jakus, Damir and … : Preliminary grid connection analysis and solution for WPP Kozjak, 2010.

Abstract: The study examines and selects the method of connecting the Kozjak wind farm to the 110 kV transmission network or the 30 kV distribution network, and examines the power flows in characteristic stationary modes of operation, in variants of complete availability of the transmission network and variants N-1

Goić, Ranko and … and Jakus, Damir and … : Preliminary grid connection analysis and solution for WPP Opor, 2010.

Abstract: The study deals with and selects the method of connecting the Opor wind farm to the 110 kV transmission network or the 30 kV distribution network, and examines the power flows in characteristic stationary modes of operation, in variants of complete availability of the transmission network and variants N-1

Goić, Ranko and … and Jakus, Damir and … : Preliminary grid connection analysis and solution for WPP Visoka, 2010.

Abstract: The study deals with and selects the method of connecting the Visoka wind power plant to the 110 kV transmission network or the 30 kV distribution network, and examines the power flows in characteristic stationary modes of operation, in variants of complete availability of the transmission network and variants N-1

Goić, Ranko and Jakus, Damir and Penović, Ivan and Paić, Goran and Krstulović, Jakov and Vasilj, Josip : Optimal technical solution for transmission connection of HPP Zakučac after reconstruction and capacity increase, 2010.

Abstract: By elaborating on the optimal technical solution for increasing the connected HE Zakučac on the existing connection, we want to determine the technical conditions that will enable the acceptance of the increase in the connected power of HE Zakučac: -

Goić, Ranko and Jakus, Damir and Penović, Ivan and Lovric, Dino and Krstulovic, Jakov : Optimal technical solution for distribution network connection of PV plant Stankovci, 2009.

Abstract: The subject of the elaboration is the assessment of the possibility of connection to the power grid of the Stankovci solar power plant planned in the area of ​​the economic zone in the settlement of Stankovci (Zadar County), and the proposal of a phased connection solution.

Goić, Ranko and Jakus, Damir and Penović, Ivan and Lovric, Dino and Krstulovic, Jakov : Preliminary design for distribution network connection of PV plant Stankovci, 2009.

Abstract: The subject of the elaboration is the assessment of the possibility of connection to the power grid of the Stankovci solar power plant planned in the area of ​​the economic zone in the settlement of Stankovci (Zadar County), and the proposal of a phased connection solution.

Goić, Ranko and … and Jakus, Damir and … : Preliminary power grid connection analysis of the WPP KPA, 2009.

Abstract: The study deals with and selects the method of connecting the Krš Pađene wind power plant to the transmission grid, and examines the power flows in characteristic stationary modes of operation, in variants of complete availability of the transmission grid and variants N-1

Goić, Ranko and Mudnić, Eugen and Jakus, Damir and Penović, Ivan and Lovric, Dino and Krstulović , Jakov : Assessment of wind farm portfolio for HEP OIE d.o.o., 2008.

Abstract: The aim of this study is to assess the existing portfolio of wind power projects developed by companies on the domestic market from the perspective of: •

Goić, Ranko and … and Jakus, Damir and … : Preliminary feasibility analysis for 6 WPP with grid connection solution and techno- economic/spatial data, 2008.

Abstract: In the study, a preliminary analysis of the justification of the construction of 6 different wind farms and their connection to the power grid was carried out with techno-economic data and spatial planning data in order to obtain a preliminary approval for the construction of a production facility.

Goić, Ranko and Mudnić, Eugen and Jakus, Damir and Penović, Ivan and Lovric, Dino and Krstulović , Jakov : Wind power portfolio assessment for E.H.N, 2008.

Abstract: The aim of this study is to assess the existing portfolio of wind power projects developed by companies on the domestic market from the perspective of: •

Goić, Ranko and … and Jakus, Damir and … : Wind power portfolio assessment for HEP OIE d.o.o., 2008.

Abstract: The aim of this study is to assess the existing portfolio of wind power projects developed by companies on the domestic market from the perspective of: •

Goić, Ranko and … and Jakus, Damir and … : The basic grid connection solution for wind power plants: Čemernica, Visoka, Opor and Perun, 2008.

Abstract: The study deals with and selects the method of connecting the Čemernica, Visoka, Opor and Perun wind farms to the 110 kV transmission network or the 30 kV distribution network.

Goić, Ranko and … and Jakus, Damir and Krstulović, Jakov : Preliminary grid connection analysis and solution for WPP Ponikve, 2008.

Abstract: The study examines and selects the method of connecting the Ponikva wind power plant to the 110 kV transmission network or the 30 kV distribution network, and examines the power flows in characteristic stationary modes of operation, in variants of complete availability of the transmission network and variants N-1

Goić, Ranko and Savičević, Josip and Jakus, Damir and Penović, Ivan and Savičević, Dejan : 110 kV cable network conception, feasibility analysis and optimal route selection for the city of Dubrovnik, 2008.

Abstract: The goal of this study is to define a proposal for the configuration of the network of the city of Dubrovnik, which would meet the needs for electricity, and in the long term ensure the security of power supply to existing and new consumers with reliable placement of electricity from existing and planned production facilities. Namely, with the adoption and construction of the first stage of the Dubrovnik Program, in addition to TS 110/35 kV Komolac, the main power supply facility of the city is TS 110/20(10) kV Srđ, and the main nodal point of the Dubrovnik area is TS 220/110/35/20(10). kV Plat. Further considerations indicate the need for the construction of an additional 110/20(10) kV transformer station, which would be located on the site of the existing TS 35/20(10) kV Lapad and take over the power supply of the western and central parts of the city of Dubrovnik.

Goić, Ranko and Savičević, Josip and Jakus, Damir and Penović, Ivan and Savičević, Dejan : Optimal location for the new TS 400/110kV in the Zadar area, 2008.

Abstract: The main goal of the study is to define a proposal for the long-term development of the transmission network in the Zadar area with a special emphasis on the preferred solution of a reliable 400/110 kV transformation that will enable the safe supply of the surrounding TS 110/x kV. The accepted version of the solution for the long-term development of the transmission network in the Zadar area will be the basis for supplementing the spatial planning documentation, detailed design work and defining the plan for the construction of the proposed facilities, reconstruction of existing and construction of new TS 110/x kV, and reconstruction of existing and construction of new DV 110 kV .

Goić, Ranko and Jakus, Damir and Penović, Ivan and Lovric, Dino : Options and transmission network stage development influenced by the connection of HPP Zakučac on 220 kV transmission network, 2008.

Abstract: Considering the complexity of the Zakučac HPP revitalization process and its importance in the EES of Croatia, adjustments and upgrades of the surrounding transmission network must be coordinated in stages, and all necessary operations prepared and carried out in a timely manner. For this reason, this report investigated and proposed a plan for the construction of the surrounding transmission network, and defined the priorities and phasing of the construction, taking into account the variant of connecting all four aggregates of HPP Zakučac to the 220 kV busbars.

Goić, Ranko and Jakus, Damir and Lovrić, Dino : Long term transmission network development for southern Dalmatia region, 2008.

Abstract: This study elaborates on the conceptual level the possible directions and stages of the development of the transmission network of southern Dalmatia, in such a way as to primarily define the proposal: -

Goić, Ranko and Jakus, Damir and Penović, Ivan : Analysis of the 110 kV network in the area of Bilice - Podi - Trogir with optimal technical solution of 110kV power line interpolation in TS Podi and TS Trogir, 2008.

Abstract: As part of the study, the basic variants of the introduction of DV 2x110 kV Trogir - Podi into TS Trogir were processed, for the foreseeable year of entry into operation of the DV 2x110 kV in question (2013) and the nominal year 2020. In doing so, the existing plans for the development of the surrounding influential transmission network and the currently foreseeable scope of construction of potential new facilities were taken into account. Also, an analysis was performed and a proposal was made for a possible option for the reconstruction of the 110 kV network from TS Podi to TS Bilica, and the fitting of a new DV 110 kV (south route) Trogir-Marina-Rogoznica-Podi/Ražine/Bilice.

Goić, Ranko and … and Jakus, Damir and … : Preliminary grid connection analysis and solution for WPP Jelinak, 2008.

Abstract: The study deals with and selects the method of connecting the Jelinak wind power plant to the 110 kV transmission network or the 30 kV distribution network, and examines the power flows in characteristic stationary modes of operation, in variants of complete availability of the transmission network and variants N-1

Goić, Ranko and … and Jakus, Damir and … : Preliminary feasibility analysis for WPP Stražbenica with grid connection solution and techno-economic/spatial data, 2008.

Abstract: In the study, a preliminary analysis of the justification of the construction of the Stražbenica plant and the connection to the electric power network was carried out with techno-economic and spatial planning data in order to obtain a preliminary approval for the construction of the production facility.

Goić, Ranko and … and Jakus, Damir and … : Preliminary feasibility analysis for WPP Orlovac 1 with grid connection solution and techno-economic/spatial data, 2008.

Abstract: In the study, a preliminary analysis of the justification of the construction of the Orlovac 1 plant and the connection to the electric power network was carried out with techno-economic and spatial planning data in order to obtain a preliminary approval for the construction of the production facility.

Goić, Ranko and … and Jakus, Damir and … : Preliminary feasibility analysis for WPP Plić with grid connection solution and techno- economic/spatial data, 2008.

Abstract: In the study, a preliminary analysis of the justification of the construction of the Pliš power plant and the connection to the electric power network was carried out with techno-economic data and spatial planning data in order to obtain a preliminary approval for the construction of the production facility.

Goić, Ranko and … and Jakus, Damir and … : Preliminary feasibility analysis for WPP Melina with grid connection solution and techno- economic/spatial data, 2008.

Abstract: In the study, a preliminary analysis of the justification of the construction of the Melina power plant and the connection to the electric power network was carried out with techno-economic and spatial planning data in order to obtain a preliminary approval for the construction of the production facility.

Goić, Ranko and … and Jakus, Damir and … : Preliminary feasibility analysis for WPP Bračevići with grid connection solution and techno-economic/spatial data, 2008.

Abstract: In the study, a preliminary analysis of the justification of the construction of the Bračevići VE plant and the connection to the electric power network was carried out with techno-economic and spatial planning data in order to obtain a preliminary approval for the construction of the production facility.

Goić, Ranko and Terzić, Božo and Bego, Ozren and Jakus, Damir and Penović, Ivan : Study of hydro power plant management for plants owned by JP „Elektroprivreda HZ Herceg Bosne“ d.d. Mostar, 2007.

Abstract: This study provides an elaboration of the hydroelectric power management system owned by EP HZHB Mostar with the aim of optimal management of production, taking into account the previously stated general and special conditions within which the system will be observed. Within this study, the following components of the production management system of EP HZHB Mostar  were elaborated

Goić, Ranko and Rakiđija, Tonko and Jakus, Damir and … : Preliminary grid connection analysis and solution for WPP Glunča, 2007.

Abstract: The study examines and selects the method of connecting the Glunča wind farm to the 110 kV transmission network or the 30 kV distribution network, and examines the power flows in characteristic stationary modes of operation, in variants of complete availability of the transmission network and variants N-1

Goić, Ranko and … and Jakus, Damir and … : Preliminary grid connection analysis and solution for WPP Svilaja, 2007.

Abstract: The study examines and selects the method of connecting the Svilaja wind farm to the 110 kV transmission network or the 30 kV distribution network, and examines power flows in characteristic stationary modes of operation, in variants of complete availability of the transmission network and variants N-1

Goić, Ranko and Jakus, Damir and … : Preliminary grid connection analysis and solution for WPP Oton, 2007.

Abstract: The study deals with and selects the method of connecting the Oton wind power plant to the 110 kV transmission network or the 30 kV distribution network, and examines the power flows in characteristic stationary modes of operation, in variants of complete availability of the transmission network and variants N-1

Goić, Ranko and … and Jakus, Damir and … : Preliminary grid connection analysis and solution for WPP Vrbnik, 2007.

Abstract: The study deals with and selects the method of connecting the Orlice wind farm to the 110 kV transmission network or the 30 kV distribution network, and examines the power flows in characteristic stationary modes of operation, in variants of complete availability of the transmission network and variants N-1

Goić, Ranko and … and Jakus, Damir and … : Short circuit analysis for pumped station Buško Blato, 2007.

Abstract: The subject of this study is the calculation of the short circuit of CS Buško Blato for the existing and planned state of the power grid in Croatia and Bosnia and Herzegovina. The short-circuit calculation was performed primarily for the purposes of dimensioning the primary equipment RP 110 kV CS Buško Blato, and it was also performed for other voltage levels.

Goić, Ranko and … and Jakus, Damir and … : Long-term grid development plans for areas Omiš- Makarska-Ploče, 2007.

Abstract: In this study, a proposal for the development of the distribution network is given based on the current situation and the forecasted growth of consumption in the considered area. The development plan is based on a detailed model of the MV power network and contains detailed development guidelines for five-year periods. For the distribution network, a forecast of the increase in consumption was made based on historical trends and plans for the realization of new larger consumer facilities.

Goić, Ranko and … and Jakus, Damir and … : Preliminary grid connection analysis and solution for WPP Crno brdo, 2007.

Abstract: The study deals with and selects the method of connecting the Crno Brdo wind farm to the 110 kV transmission network or the 30 kV distribution network, and examines the power flows in characteristic stationary modes of operation, in variants of complete availability of the transmission network and variants N-1

Goić, Ranko and Vidučić, Ljiljana and Pašalić, Želimir and Klepo, Tina and Rimac Smiljanić, Ana and Jakus, Damir : Small HPP Peruća fesibility study, 2006.

Abstract: This study deals with the energy-economic contributions of the construction of the Peruć HPP, in such a way as to determine the possible annual production of the Peruć HPP, taking into account the operating regime of the Peruć HPP and the way the Peruć reservoir is used, as well as the expected average monthly elevation of the Peruć reservoir, as two basic parameters that determine the possible production of MHE Peruć. Next, the real economic value of the electricity produced at MHE Peruća is determined, and the costs of investment and operation of MHE Peruća are updated. Based on the previous input assumptions, in the second part of the study, an economic-financial analysis (liquidity analysis) of the Peruć HPP construction project was performed, as well as an analysis of the project’s effectiveness and a corresponding risk analysis, i.e. sensitivity to changes in input parameters/assumptions.