In the study, a preliminary analysis of the justification for the construction of a hydropower plant owned by the company EHN d.o.o. was carried out with a proposal for connection to the electric power network and defined techno-economic data and spatial planning data with the aim of obtaining prior approval for the construction of a production facility.