Short circuit analysis for pumped station Buško Blato

Abstract

The subject of this study is the calculation of the short circuit of CS Buško Blato for the existing and planned state of the power grid in Croatia and Bosnia and Herzegovina. The short-circuit calculation was performed primarily for the purposes of dimensioning the primary equipment RP 110 kV CS Buško Blato, and it was also performed for other voltage levels.

Type