Home
Posts
Projects
Teaching
Publications
Research Papers
Thesis supervised
Technical Studies
Team
Contact
CV (PDF)
Light
Dark
Automatic
Wind Power Plant
The basic grid connection solution for wind power plants: Čemernica, Visoka, Opor and Perun
The study deals with and selects the method of connecting the Čemernica, Visoka, Opor and Perun wind farms to the 110 kV transmission …
Ranko Goić
,
Damir Jakus
,
…
Cite
Calculation of Annual Active Energy Losses in a Distribution Network with a Connected
The connection of distributed energy sources to the distribution network, among other influences, results in a redistribution of power …
Ranko Goić
,
Damir Jakus
,
Eugen Mudnić
Cite
Preliminary grid connection analysis and solution for WPP Crno brdo
The study deals with and selects the method of connecting the Crno Brdo wind farm to the 110 kV transmission network or the 30 kV …
Ranko Goić
,
Damir Jakus
,
…
Cite
Preliminary grid connection analysis and solution for WPP Glunča
The study examines and selects the method of connecting the Glunča wind farm to the 110 kV transmission network or the 30 kV …
Ranko Goić
,
Tonko Rakiđija
,
Damir Jakus
,
…
Cite
Preliminary grid connection analysis and solution for WPP Oton
The study deals with and selects the method of connecting the Oton wind power plant to the 110 kV transmission network or the 30 kV …
Ranko Goić
,
Damir Jakus
,
…
Cite
Preliminary grid connection analysis and solution for WPP Svilaja
The study examines and selects the method of connecting the Svilaja wind farm to the 110 kV transmission network or the 30 kV …
Ranko Goić
,
Damir Jakus
,
…
Cite
Preliminary grid connection analysis and solution for WPP Vrbnik
The study deals with and selects the method of connecting the Orlice wind farm to the 110 kV transmission network or the 30 kV …
Ranko Goić
,
Damir Jakus
,
…
Cite
«
Cite
×