Wind Power Plant
Preliminary power grid connection analysis of the WPP KPA
The study deals with and selects the method of connecting the Krš Pađene wind power plant to the transmission grid, and examines the …
Ranko Goić
,
Damir Jakus
,
…
Cite
Integration of wind energy into Croatian power system
The possibility of fitting wind farms of large power into the power system, and coordinating their work with other classic production …
Ranko Goić
,
Damir Jakus
,
Ivan Penović
,
Josip Vasilj
,
Aleksandar Kovačević
,
Marko Lovrić
,
Mario Klarić
Cite
Preliminary feasibility analysis for 6 WPP with grid connection solution and techno- economic/spatial data
In the study, a preliminary analysis of the justification of the construction of 6 different wind farms and their connection to the …
Ranko Goić
,
Damir Jakus
,
…
Cite
Preliminary feasibility analysis for WPP Bračevići with grid connection solution and techno-economic/spatial data
In the study, a preliminary analysis of the justification of the construction of the Bračevići VE plant and the connection to the …
Ranko Goić
,
Damir Jakus
,
…
Cite
Preliminary feasibility analysis for WPP Melina with grid connection solution and techno- economic/spatial data
In the study, a preliminary analysis of the justification of the construction of the Melina power plant and the connection to the …
Ranko Goić
,
Damir Jakus
,
…
Cite
Preliminary feasibility analysis for WPP Orlovac 1 with grid connection solution and techno-economic/spatial data
In the study, a preliminary analysis of the justification of the construction of the Orlovac 1 plant and the connection to the electric …
Ranko Goić
,
Damir Jakus
,
…
Cite
Preliminary feasibility analysis for WPP Plić with grid connection solution and techno- economic/spatial data
In the study, a preliminary analysis of the justification of the construction of the Pliš power plant and the connection to the …
Ranko Goić
,
Damir Jakus
,
…
Cite
Preliminary feasibility analysis for WPP Stražbenica with grid connection solution and techno-economic/spatial data
In the study, a preliminary analysis of the justification of the construction of the Stražbenica plant and the connection to the …
Ranko Goić
,
Damir Jakus
,
…
Cite
Preliminary grid connection analysis and solution for WPP Jelinak
The study deals with and selects the method of connecting the Jelinak wind power plant to the 110 kV transmission network or the 30 kV …
Ranko Goić
,
Damir Jakus
,
…
Cite
Preliminary grid connection analysis and solution for WPP Ponikve
The study examines and selects the method of connecting the Ponikva wind power plant to the 110 kV transmission network or the 30 kV …
Ranko Goić
,
…
,
Damir Jakus
,
Jakov Krstulović
Cite
«
»