Alternative grid connection solutions for wind power plant locations owned by EHN d.o.o. in Split-dalmatia couty
In the study, a preliminary analysis of the justification for the construction of a hydropower plant owned by the company EHN d.o.o. …
Ranko Goić
,
Damir Jakus
,
…
Cite
Optimal technical solution for transmission grid connection of WPP Glunča
As part of this study, the technical and energy requirements that the wind power plant must fulfill in order to obtain approval for …
Ranko Goić
,
Goran Paić
,
Damir Jakus
,
Ivan Penović
,
Dino Lovric
Cite
Optimal technical solution for transmission grid connection of WPP Jelinak
As part of this study, the technical and energy requirements that the wind power plant must fulfill in order to obtain approval for …
Ranko Goić
,
Goran Paić
,
Damir Jakus
,
Dino Lovric
Cite
Preliminary feasibility analysis for WPP Mikanovci with grid connection solution and techno-economic/spatial data
In the study, a preliminary analysis of the justification of the construction of the Mikanovci wind farm and the connection to the …
Ranko Goić
,
Damir Jakus
,
…
Cite
Preliminary grid connection analysis and solution for WPP Čemernica
The study deals with and selects the method of connecting the Čemernica wind power plant to the 110 kV transmission network or the 30 …
Ranko Goić
,
Damir Jakus
,
…
Cite
Preliminary grid connection analysis and solution for WPP Kozjak
The study examines and selects the method of connecting the Kozjak wind farm to the 110 kV transmission network or the 30 kV …
Ranko Goić
,
Damir Jakus
,
…
Cite
Preliminary grid connection analysis and solution for WPP Ljubač
The study examines and selects the method of connecting the Ljubač wind power plant to the 110 kV transmission network or the 30 kV …
Ranko Goić
,
Damir Jakus
,
…
Cite
Preliminary grid connection analysis and solution for WPP Opor
The study deals with and selects the method of connecting the Opor wind farm to the 110 kV transmission network or the 30 kV …
Ranko Goić
,
Damir Jakus
,
…
Cite
Preliminary grid connection analysis and solution for WPP Visoka
The study deals with and selects the method of connecting the Visoka wind power plant to the 110 kV transmission network or the 30 kV …
Ranko Goić
,
Damir Jakus
,
…
Cite
VOLTAGE PROFILE ANALYSIS IN 30 KV NETWORK AFTER CONNECTION OF WPP ORLICE
Among the most important factors that affect the quality of electricity supply and the orderly operation of the power system is …
Ranko Goić
,
Damir Jakus
,
Jakov Krstulović Opara
,
Josip Vasilj
Cite
«
»
Cite
×