Optimal technical solution for transmission grid connection of WPP Ogorje
As part of this study, the technical and energy requirements that the wind power plant must fulfill in order to obtain approval for …
Ranko Goić
,
Ivan Penović
,
Goran Paić
,
Damir Jakus
,
Dino Lovric
Cite
Optimal technical solution for transmission grid connection of WPP ST1-1 Voštane and WPP ST1-2 Kamensko
As part of this study, the technical and energy requirements that the wind power plant must fulfill in order to obtain approval for …
Ranko Goić
,
Ivan Penović
,
Goran Paić
,
Damir Jakus
,
Dino Lovric
Cite
Preliminary grid connection analysis and solution for WPP Boraja II
The study deals with and selects the method of connecting the Boraja II wind power plant to the 110 kV transmission network or the 30 …
Ranko Goić
,
Damir Jakus
,
…
Cite
Preliminary grid connection analysis and solution for WPP Orljak
The study examines and selects the method of connecting the Orljak wind power plant to the 110 kV transmission network or the 30 kV …
Ranko Goić
,
Damir Jakus
,
…
Cite
Preliminary grid connection analysis and solution for WPP ST3-1/2 Visoka Zelovo
The study deals with and selects the method of connecting the wind power plant ST3-1/2 Visoka Zelovo to the 110 kV transmission network …
Ranko Goić
,
Ivan Penović
,
Goran Paić
,
Damir Jakus
,
Dino Lovric
Cite
Concept design and variants for construction of transformer station 110/x kV Zamošće
The purpose of this report is to review the basic variants of the construction and connection of the new TS 110/x Zamošće. The …
Ranko Goić
,
Josip Vasilj
,
Ivan Penović
,
Goran Paić
,
Damir Jakus
Cite
Preliminary grid connection analysis and solution for WPP Crno brdo
The study deals with and selects the method of connecting the Crno Brdo wind farm to the 110 kV transmission network or the 30 kV …
Ranko Goić
,
Damir Jakus
,
…
Cite
Optimal technical solution for transmission connection of HPP Zakučac after reconstruction and capacity increase
By elaborating on the optimal technical solution for increasing the connected HE Zakučac on the existing connection, we want to …
Ranko Goić
,
Damir Jakus
,
Ivan Penović
,
Goran Paić
,
Jakov Krstulović
,
Josip Vasilj
Cite
Optimal technical solution for transmission grid connection of WPP Glunča
As part of this study, the technical and energy requirements that the wind power plant must fulfill in order to obtain approval for …
Ranko Goić
,
Goran Paić
,
Damir Jakus
,
Ivan Penović
,
Dino Lovric
Cite
Optimal technical solution for transmission grid connection of WPP Jelinak
As part of this study, the technical and energy requirements that the wind power plant must fulfill in order to obtain approval for …
Ranko Goić
,
Goran Paić
,
Damir Jakus
,
Dino Lovric
Cite
«
»