IMPACT OF RENEWABLE ENERGY SOURCES CONNECTION ON THE ELECTRICITY GRID
Electricity generation through distributed sources is increasingly used in the power system. Some benefits of this method of …
Kristijan Erceg
Cite
Impact of distributed generation on distribution network conditions
Distributed production plays an increasingly important role in reducing losses in the network, reducing electricity prices, achieving …
Bože Ćaleta
Cite
Impact of PV Power Plants on the Voltage Conditions and Power System Losses in MV Distribution Network
Photovoltaic plants (PV) are among the fastest growing energy sources in the world, with annual growth rates of 25-35% over the last …
Damir Jakus
,
Josip Vasilj
,
Ranko Goić
Cite
IMPACT OF PV POWER PLANTS ON THE VOLTAGE CONDITIONS AND POWER SYSTEM LOSSES IN MV DISTRIBUTION NETWORK
Solar photovoltaic (PV) plants are the fastest growing energy sources in the world, with annual growth rates of 25-35% over the last …
Damir Jakus
,
Tomislav Šarić
Cite
Preliminary grid connection analysis and solution for WPP Tovarnik
The study examines and selects the method of connecting the Tovarnik wind power plant to the 110 kV transmission network or the 30 kV …
Ranko Goić
,
Damir Jakus
,
…
Cite
Optimal technical solution for transmission grid connection of WPP ST3-1/2 Visoka Zelovo
As part of this study, the technical and energy requirements that the wind power plant must fulfill in order to obtain approval for …
Ranko Goić
,
Damir Jakus
,
…
Cite
Preliminary grid connection analysis and solution for WPP Čućin
The study examines and selects the method of connecting the Čućin wind power plant to the 110 kV transmission network or the 30 kV …
Ranko Goić
,
Damir Jakus
,
…
Cite
Preliminary grid connection analysis and solution for WPP Otrić
The study examines and selects the method of connecting the Otrić wind power plant to the 110 kV transmission network or the 30 kV …
Ranko Goić
,
Damir Jakus
,
…
Cite
Preliminary grid connection analysis and solution for WPP ZD2P and WPP ZD3P
As part of this study, the technical and energy requirements that the wind power plant must fulfill in order to obtain approval for …
Ranko Goić
,
Damir Jakus
,
…
Cite
Optimal technical solution for transmission grid connection of WPP Lukovac
As part of this study, the technical and energy requirements that the wind power plant must fulfill in order to obtain approval for …