Optimal Grid Connection
Preliminary grid connection analysis and solution for WPP Jelinak
The study deals with and selects the method of connecting the Jelinak wind power plant to the 110 kV transmission network or the 30 kV …
Ranko Goić
,
Damir Jakus
,
…
Cite
Preliminary grid connection analysis and solution for WPP Ponikve
The study examines and selects the method of connecting the Ponikva wind power plant to the 110 kV transmission network or the 30 kV …
Ranko Goić
,
…
,
Damir Jakus
,
Jakov Krstulović
Cite
Preliminary grid connection analysis and solution for WPP Crno brdo
The study deals with and selects the method of connecting the Crno Brdo wind farm to the 110 kV transmission network or the 30 kV …
Ranko Goić
,
Damir Jakus
,
…
Cite
Preliminary grid connection analysis and solution for WPP Glunča
The study examines and selects the method of connecting the Glunča wind farm to the 110 kV transmission network or the 30 kV …
Ranko Goić
,
Tonko Rakiđija
,
Damir Jakus
,
…
Cite
Preliminary grid connection analysis and solution for WPP Oton
The study deals with and selects the method of connecting the Oton wind power plant to the 110 kV transmission network or the 30 kV …
Ranko Goić
,
Damir Jakus
,
…
Cite
Preliminary grid connection analysis and solution for WPP Svilaja
The study examines and selects the method of connecting the Svilaja wind farm to the 110 kV transmission network or the 30 kV …