Analysis of the 110 kV network in the area of Bilice - Podi - Trogir with optimal technical solution of 110kV power line interpolation in TS Podi and TS Trogir

Abstract

As part of the study, the basic variants of the introduction of DV 2x110 kV Trogir - Podi into TS Trogir were processed, for the foreseeable year of entry into operation of the DV 2x110 kV in question (2013) and the nominal year 2020. In doing so, the existing plans for the development of the surrounding influential transmission network and the currently foreseeable scope of construction of potential new facilities were taken into account. Also, an analysis was performed and a proposal was made for a possible option for the reconstruction of the 110 kV network from TS Podi to TS Bilica, and the fitting of a new DV 110 kV (south route) Trogir-Marina-Rogoznica-Podi/Ražine/Bilice.

Type