The basic grid connection solution for wind power plants: Čemernica, Visoka, Opor and Perun

Abstract

The study deals with and selects the method of connecting the Čemernica, Visoka, Opor and Perun wind farms to the 110 kV transmission network or the 30 kV distribution network.

Type