Study of hydro power plant management for plants owned by JP „Elektroprivreda HZ Herceg Bosne“ d.d. Mostar

Abstract

This study provides an elaboration of the hydroelectric power management system owned by EP HZHB Mostar with the aim of optimal management of production, taking into account the previously stated general and special conditions within which the system will be observed. Within this study, the following components of the production management system of EP HZHB Mostar  were elaborated

Type