Report
Planning and development of the medium voltage distribution grid in the area Elektrojug for the period 2011-2031.
In this study, a proposal for the development of the distribution network is given based on the current situation and the forecasted …
Ranko Goić
,
Krstulović Jakov Penović Ivan
,
Vasilj Josip
,
Damir Jakus
Cite
Preliminary grid connection analysis and solution for WPP Čućin
The study examines and selects the method of connecting the Čućin wind power plant to the 110 kV transmission network or the 30 kV …
Ranko Goić
,
Damir Jakus
,
…
Cite
Preliminary grid connection analysis and solution for WPP Otrić
The study examines and selects the method of connecting the Otrić wind power plant to the 110 kV transmission network or the 30 kV …
Ranko Goić
,
Damir Jakus
,
…
Cite
Preliminary grid connection analysis and solution for WPP ZD2P and WPP ZD3P
As part of this study, the technical and energy requirements that the wind power plant must fulfill in order to obtain approval for …
Ranko Goić
,
Damir Jakus
,
…
Cite
Interpolation of TS 220/110/35/20(10) kV Plat into existing power system grid
This study deals with the issue of entering into operation TS 220/110/35/20(10) kV Plat and the associated connection lines 220, 110, …
Ranko Goić
,
Goran Paić
,
Damir Jakus
,
Jakov Krstulović
,
Josip Vasilj
Cite
Optimal technical solution for transmission grid connection of WPP Lukovac
As part of this study, the technical and energy requirements that the wind power plant must fulfill in order to obtain approval for …
Ranko Goić
,
Damir Jakus
,
…
Cite
Optimal technical solution for transmission grid connection of WPP Ogorje
As part of this study, the technical and energy requirements that the wind power plant must fulfill in order to obtain approval for …
Ranko Goić
,
Ivan Penović
,
Goran Paić
,
Damir Jakus
,
Dino Lovric
Cite
Optimal technical solution for transmission grid connection of WPP ST1-1 Voštane and WPP ST1-2 Kamensko
As part of this study, the technical and energy requirements that the wind power plant must fulfill in order to obtain approval for …
Ranko Goić
,
Ivan Penović
,
Goran Paić
,
Damir Jakus
,
Dino Lovric
Cite
Preliminary grid connection analysis and solution for WPP Boraja II
The study deals with and selects the method of connecting the Boraja II wind power plant to the 110 kV transmission network or the 30 …
Ranko Goić
,
Damir Jakus
,
…
Cite
Preliminary grid connection analysis and solution for WPP Orljak
The study examines and selects the method of connecting the Orljak wind power plant to the 110 kV transmission network or the 30 kV …
Ranko Goić
,
Damir Jakus
,
…
Cite
«
»
Cite
×